Browser Extension

Version 1.0.7 — August 2026

The FlowUpBoard Quick Update extension for Chrome lets you move tasks between columns and mark them done straight from your browser toolbar — no need to open the app. It is free, lightweight, and asks for no extra permissions.

⏱
FlowUpBoard Quick Update
Manifest V3 · Chrome / Edge / Brave · ~13 KB · Open source
Download extension (.zip) View source on GitHub

What it does

  • Quick status updates — mark tasks done or move them to another column without opening the app.
  • Board switcher — pick any board you have access to from the toolbar popup.
  • Your API token — the extension authenticates with a long-lived API token you create in Settings. It never touches your password.
  • No extra permissions — the extension only needs access to your FlowUpBoard API and the settings page.

Install

1
Download the zip

Click Download extension (.zip) above and save it somewhere easy to find.

2
Unzip it

Extract the folder (for example right-click → Extract All). You should see manifest.json, popup.html, popup.js, styles.css, and an icons folder.

3
Open your extensions page

Open chrome://extensions in Chrome (or Edge / Brave). Turn on Developer mode using the toggle in the top-right corner.

4
Load the extension

Click Load unpacked and select the unzipped flowupboard-quick-update folder. The extension is now installed — pin it to your toolbar via the puzzle-piece icon.

Connect your account

1
Create an API token

Log in to FlowUpBoard and open Settings → API Tokens. Click Create API token and copy the token — it is shown only once.

2
Add it to the extension

Click the FlowUpBoard icon in your toolbar, paste the token, and hit Save. Your token is stored locally in your browser only.

3
Update tasks

Pick a board, then mark tasks done or drag-free-move them between columns. Changes sync instantly.

Security

Your API token is long-lived (365 days by default) and can do everything your account can, so treat it like a password. Your token is stored only in chrome.storage.local and is never sent to anyone but FlowUpBoard. If a token is ever exposed, revoke it instantly from Settings → API Tokens and create a new one.

Troubleshooting

  • "Invalid token" — the token may be revoked or expired. Create a fresh one in Settings and update the extension.
  • No boards listed — make sure you are signed in to the correct FlowUpBoard account in your browser.
  • Extension won't load — you selected the wrong folder. Choose the folder that contains manifest.json directly.
  • Changes not showing — refresh the FlowUpBoard tab; updates sync in real time.

Coming to the Chrome Web Store

We are working on publishing the extension to the Chrome Web Store for one-click install. Until then, follow the install steps above — the whole process takes under a minute.

← Back to home