From a one-sentence goal to shipped work
FlowUpBoard turns a rough goal into a working board, keeps the work moving, and tells you where it stands at the end of every sprint.
Four steps, one board
No migrations between tools. Planning, delivery, and reporting all happen on the same surface.
1. Describe the goal
Write what you are trying to ship in one sentence. There is no template to fill in and no fields to configure before you can start.
2. AI drafts the backlog
You get a prioritized set of tasks and subtasks with estimated effort, ready for you to review, refine, and reorder before anything is committed.
3. Work the board
Drag cards across Todo, In Progress, Review, and Done. See teammates live, assign work, and let WIP limits keep the team from overcommitting.
4. Read the sprint summary
At the end of each sprint, AI writes what shipped, what is blocked, and what needs attention, so the status update writes itself.
What happens under the hood
The board quietly learns your delivery pattern and uses it to keep your dates honest.
Forecasts from real history
Cycle time and throughput come from your own completed work, not a default estimate, so a delivery date reflects how your team actually moves.
Bottlenecks surface early
When work piles up in one column, FlowUpBoard flags it before it turns into a stalled sprint, instead of after the deadline slips.
WIP limits that adapt
Limits start from your own flow data and adjust as your team gets faster or slower, so the board keeps matching reality.
Works the way your team already works
Kanban flow and Scrum sprints run on the same board, so changing process does not mean migrating tools.
Kanban
Continuous pull-based flow with explicit WIP limits, cycle time, and throughput you can watch every day.
Scrum
Plan a sprint at the start, get an AI-written summary at the end, and keep the same board for every iteration.
Real-time collaboration
Live presence, instant updates, and an activity feed mean the board is the single source of truth instead of a meeting.
Want the full capability list? Read every FlowUpBoard feature, or see exactly how the built-in AI behaves inside the workflow.
Frequently asked questions about how FlowUpBoard works
How the board gets set up, what AI does, and what it costs to start.
How does FlowUpBoard work?
Do I have to use AI to set up my backlog?
Can FlowUpBoard be used with Scrum sprints as well as Kanban flow?
How long does it take to set up a board?
Does FlowUpBoard work for personal task management too?
Ready to try it?
Create a board in about 30 seconds. No credit card required.